Résumé
TotalEnergies leverages my expertise in reservoir engineering to optimize production and injection strategies for the CLOV FPSO asset in Angola. Using tools like Petrel RE, Kappa, GAP, and Intersect, I contribute to dynamic field model updates and conduct simulations to refine operational guidelines, ensuring optimal resource management. Pursuing a master’s degree at Ecole Nationale Supérieure des Mines de Nancy, I bring a strong foundation in geosciences and civil engineering to my work. With a focus on safe, sustainable practices, I align technical acumen with strategic goals, striving to enhance energy sector operations through collaboration and innovation.
Expériences professionnelles
Reservoir engineer e&p angola - block 17 - clov
totalenergies
De Mars 2024 à Janvier 2026
CLOV is an FPSO (Floating Production, Storage, and Offloading vessel) located in the deep offshore waters of Angola with a production capacity of 200,000 barrels per day.
Softwares: Petrel RE, Kappa, GAP, Intersect
My tasks:
- Adhere to and implement the HSE (Health, Safety, and Environment), Compliance, and Sustainable Development rules of the group and subsidiary within the scope of its activities.
- Participate in updating dynamic field models by integrating well results and monitoring data.
- Conduct simulations to define base profiles and sensitivities while contributing to optimal production and injection guidelines.
- Contribute to defining, updating, and monitoring reservoir monitoring plans.
- Analyze production data to identify trends, aiding in production optimization and greenhouse gas reduction (PTA, WCT, VRR...).
- Study new developments by evaluating their probable resources and associated risks.
- Create synthesis documents and intelligent dashboards to aid reservoir management and decision-making.
Master thesis: reservoir engineer e&p angola - block 17 – clov
totalenergies
De Mars 2024 à Août 2024
Assistant site supervisor
VINCI CONSTRUCTION
De Juin 2023 à Septembre 2023
The project involved the renovation of a 6-story office building in Paris. I served as the site manager during the installation phase. I led a team of 7 workers (4 laborers and 3 finishers) to execute the work by planning tasks efficiently. The tasks included setting up living quarters, site preparation, and finishing the entire building. I was also responsible for ensuring the proper execution of work carried out by contractors and subcontractors. I conducted measurements for waterproofing, sandblasting, restoration, and metalwork tasks.
Internship as a laborer in the construction industry
TRAVAUX PUBLICS DE NORMANDIE SAS
De Janvier 2022 à Février 2022
Fellow in the construction of a parking lot. I understood the hierarchical relationships among fellow workers within the company, and I realized how demanding outdoor manual labor can be.